37.5 Million Directories Migrated With the Final Sync in 48 Hours for a Fortune 10 Tech Giant
Business Need
A Swift and Precise Data Migration
-
Migrating Billions of Files: A mammoth task of moving billions of files from one storage system to another within the same cluster.
-
Meeting Cutover Window: A challenging cutover window of 48 hours only to complete the entire migration.
-
Syncing Incremental Updates: Ensuring that incremental updates in the files were seamlessly synced during the migration.
-
Optimizing Throughput: Achieving optimal data transfer speeds while maintaining accuracy and efficiency.
Challenges Faced
Overcoming File System Updates and Glitches
-
Constant File System Updates: Ongoing updates to the file system demanded additional efforts in comparison and synchronization during migration.
-
Strict Cutover Window: The tight 48-hour window left no room for delays or inefficiencies.
-
Previous Tool Limitations: The previous migration tool was unable to handle incremental copies efficiently, causing delays and glitches in the process.
-
Optimizing Throughput: Striking the right balance between fast data transfer and accuracy posed a challenge.
Solution Offered
Single Pane View
Data Dynamics’ Mobility Module provided a comprehensive view across the migration process, simplifying management and control
Policy-Based Approach
Utilizing a policy-based approach, the migration process maximized data access, minimized cutover windows, user downtime, and disruptions related to file storage rebalancing, migrations, and tech refreshes
QoS Control
The software allowed setting Quality of Service (QoS) during replication to minimize the impact on clients
Efficient Incremental Migration
Automated data replication policies facilitated the replication of source files to the destination location, including both baseline and incremental copies
Minimal Business Disruption
The seamless cutover process ensured minimal disruption to business operations, meeting the stringent 48-hour migration target
Business Impact
37.5 Million Directories Migrated: A staggering 37.5 million directories, containing 977 million files, were successfully migrated within the 48-hour cutover window.
Enhanced Efficiency: The automated data replication policies enabled efficient handling of incremental updates during the migration process.
Reduced Outage: The accelerated migration process minimized disruption within the cluster, ensuring a seamless transition with minimal downtime.